- Full HVAC, plumbing, site utilities & fire
protection
- Gas-fired furnaces
- Exposed ductwork system
|
|
This project was a new middle school
campus with full HVAC, plumbing, site utilities, and
fire protection design for eight school buildings.
The classroom buildings each have a classroom
gas-fired furnace and sink. The 3,000 square foot library
building has an exposed ductwork system supplied by
a grade-mounted packaged air conditioning unit.
The open-air multi-purpose building features
overhead forced air heating through exposed ductwork.
The school opened in 1996.
|