- Concept design for 6,000-ton central
chilled water plant
- Detail design & construction
administration
- Hydraulic & compressible flow
models
- Life cycle costing
|
|
Axiom Engineers(sm) determined the
steam and chilled water demands for a 20-year
master plan and incremental requirements, designed
the concept site-wide distribution system, prepared
flow modeling, selected materials, and developed
life cycle costs and installation budgets. Axiom
Engineers(sm) installed boiler stack economizers
and the first section of new underground mains.
Our initial concept design of the
new 6,000-ton central chilled water plant with
a distribution system for the proposed facility
20-year master plan was just a part of this huge
project. Our services included engineering, layout
of a distribution piping system, defining building
interfaces and pumping schemes, materials and
methods selection, budget cost estimating life
cycle costing, and preparing reports and drawings.
Axiom Engineers(sm) was in charge of the detail
design and construction management of the Phase
I installation.
Hydraulic and compressible flow
models were used to develop operating cost data for
life cycle analysis. Bayer uses a fifty-year time-horizon
for life cycle costs. With this long time-horizon,
operational costs far exceed first costs.
|